Mapping stage and preparation of tender documents as part of the manufacturing plant relocation project
- Daniel Asseraf, DVIEWSION CEO
- Sep 28
- 2 min read
The relocation of a manufacturing plant is a complex undertaking that requires meticulous planning and precise management of every stage. Unlike an office move, a plant relocation involves handling a wide range of items, from standard equipment to heavy machinery, hazardous and sensitive materials, and high-value assets.
The purpose of this document is to provide a framework for planning and executing the mapping and documentation phase, which is critical to the overall success of the project.
Phase A: Mapping and Inventory Management
This phase forms the foundation of the entire project. Accurate mapping helps prevent delays, avoid equipment loss, and enables the preparation of professional tender documents.
Item Classification:
General Equipment: Office furniture, tools, and non-sensitive laboratory equipment.
Heavy and Production Equipment: Machines, production systems, assembly lines.
Sensitive/Delicate Equipment: Electronic components, optics, precision instruments requiring specialized packaging.
Hazardous Materials: Chemicals, compressed gases, flammable materials - requiring special handling and permits.
Database Creation:
Each item will be assigned a unique identification number.
The database will include: item name, description, current location in the old plant, designated location in the new plant, special packaging requirements (e.g., wood, anti-rust materials, ESD protection), transfer notes, and weight/dimensions.
Labeling and Marking:
Each item identified will be labeled with its unique ID.
Labels will also specify the final destination in the new plant (e.g., R&D department, chemistry lab).
Use of barcode or RFID (electronic tagging) technologies can streamline the process and minimize human error.
Phase B: Preparation of Tender Documents and Supplier Engagement
Once the mapping is complete, the data must be used to prepare transparent and detailed documents for potential suppliers.
Detailed Technical Specification: Clearly define the type, quantity, weight, and unique handling and packaging requirements of each category. Include a comprehensive inventory list of all items to be relocated.
Safety and Regulatory Requirements: The tender must specify requirements for handling hazardous materials and sensitive equipment in compliance with relevant standards and regulations.
Timelines: Define clear schedules for every stage of the project, from disassembly and transport to reinstallation.
Liability and Insurance: The tender must specify insurance requirements to cover potential damages to valuable equipment.
Key Challenges and Success Factors
Reverse Process Planning: Relocation is not only about transportation but also about reassembling systems at the new facility. Accurate mapping, including photos and dismantling notes, will significantly facilitate reassembly.
Communication and Collaboration: Success depends on seamless integration between all stakeholders - the project team, suppliers, engineering staff, and plant operations teams.
Accurate Cost Estimation: A well-structured mapping process enables suppliers to accurately assess the scope of work and provide precise quotations, preventing unexpected costs later.
Through careful planning and the use of appropriate technological tools, the plant relocation can be executed smoothly and efficiently, minimizing operational downtime and ensuring business continuity.